Big Air Sterling Heights shows how a closed trampoline park can be strategically repositioned into a premium family entertainment center.
Akrobat removed outdated attractions, preserved the main court, and redesigned the 1200 m² space around a stronger attraction mix, improved guest flow, Smart Park integration, and a custom rope course.
By running design, engineering, production, logistics, and site preparation in parallel, the project was delivered in just 123 days – reducing downtime, limiting rent exposure, and helping the investor reopen faster.